Saving-E | SAVING-E Project kicks-off
17031
post-template-default,single,single-post,postid-17031,single-format-standard,do-etfw,tribe-no-js,ajax_fade,page_not_loaded,,qode-child-theme-ver-1.0.0,qode-theme-ver-11.1,qode-theme-bridge,wpb-js-composer js-comp-ver-4.12,vc_responsive
 

SAVING-E Project kicks-off

Take a look of our latest news

SAVING-E Project kicks-off

The project LIFE14 ENV/ES/000633 – LIFE SAVING-E “Two-Stage Autotrophic N-removal for mainstream sewage treatment” held its kick-off meeting on 5th November 2015 at the UAB premises in Barcelona. Funded by the EU LIFE programme, SAVING-E project will explore the possibility of generating energy from the treatment of urban wastewater. The aim of this project, coordinated by the Universitat Autònoma de Barcelona, is to radically re-design urban wastewater treatment plants (WWTP) so that they can produce energy with no loss – or even with a gain – in performance.

SAVING-E project will explore the possibility of generating energy from the treatment of urban wastewater.

The project has a total duration of four years (01/10/2015 – 31/03/2019).The consortium of the project is formed by 4 partners which empower the initiative with relevant experience as well as their broad networking influence and reach: Universitat Autònoma de Barcelona (UAB), Depuración de Aguas del Mediterráneo (DAM), Agència Catalana de l’Aigua (ACA) and The European Technology for Water (WssTP).

Tags: